This page has beta status

MPNS COST Action TD0906
Biological adhesives: from biology to biomimetics

Descriptions are provided by the Actions directly via e-COST.

The main objective of this Action is to gain new understanding relating to the mode of action of biological adhesives so as to facilitate the development of synthetic counterparts with improved function. These bio-inspired adhesives will provide more elegant solutions to contemporary engineering and biomedical adhesive requirements and will additionally provide a platform for future technological innovation that requires adhesion in hostile conditions as a prerequisite.

Biological adhesives often offer impressive performances and, therewith, the potential to inspire novel, superior industrial adhesives for an increasing variety of high-tech applications. Using an iterative, multidisciplinary biomimetic approach, structures, functions and principles of natural models can be experimentally studied, theoretically analyzed, and prototyped in order to bring innovative bio-inspired adhesives to the market. This COST Action will unite widespread European expertise and activities in the fields of biological and technological adhesives (biology, physics, chemistry, and engineering), streamlining and pooling knowledge, methods and techniques, avoiding duplication of effort, decreasing costs, and accelerating scientific and technological progress in Europe.


General Information*

Chair of the Action:

Dr Patrick FLAMMANG (BE)

Vice Chair of the Action:

Dr Romana SANTOS (PT)

DC Rapporteurs:

Dr Anthony R. FLAMBARD (DE)

DC Rapporteurs:

Prof Venceslav KAUCIC (SI)

Science officer of the Action:

Dr Mafalda QUINTAS

Administrative officer of the Action:

Ms Anja VAN DER SNICKT

Downloads*

Action Fact Sheet

Download AFS as .RTF

Memorandum of Understanding

Download MoU as PDF

Annual Progress Conference Report

Download Annual Progress Conference Report as PDF

Progress Report

Download Progress Report as PDF

Poster

Download Poster as PDF

Websites*

* content provided by e-COST.
Data is synchronised once per night.

Tools

Last updated: 02 May 2011 top of page

Follow COST on

  • Twitter
  • LinkedIn
  • Facebook
  • YouTube