This page has beta status

ISCH COST Action A29
Human and Organisational Factors in Industrial Planning and Scheduling - HOPS

The main objective of HOPS is to increase the knowledge required for improving human performance in industrial planning, scheduling, and control (PSC). It is assumed that a breakthrough in these areas is a major prerequisite for a signifi cant step forward in PSC-performance of industrial organisations. The potential that is hidden in human-centred approaches most likely exceeds the untapped potential in the (prevalent) technology oriented approaches by a signifi cant amount. Although the Action aims at an integration of the isolated knowledge islands in the domain, a pluralism of research methods and approaches will be applied in order to keep a holistic perspective.

Working Groups:

* 1 Collaborative/distributed PSC

* 2 Decision Support Systems in PSC

* 3 Research methods in PSC

(Descriptions are provided by the Actions directly via e-COST.)


General Information*

Chair of the Action:

Prof. Toni WÄFLER (CH)

Vice Chair of the Action:

Prof Jan FRANSOO (NL)

Science officer of the Action:

Dr Luule MIZERA

Administrative officer of the Action:

Mr Leo GUILFOYLE

Downloads*

Action Fact Sheet

Download AFS as .RTF

Memorandum of Understanding

Download MoU as PDF

Progress Report

Download Progress Report as PDF

Websites*

* content provided by e-COST.
Data is synchronised once per night.

Tools

Last updated: 02 May 2011 top of page